Franklin County Engineer Facebook Feed

Franklin County Engineer

As a local public works agency headquartered in Columbus, Ohio, the Franklin County Engineer's Office is responsible for the maintenance and construction of 271 miles of county roadway and 351 county bridges, as well as upkeep of all county ditches, drains, retention basins, and other storm water facilities within the right-of-way of county roads in unincorporated areas. To meet the continuing development and infrastructure needs of Franklin County, the Engineer's Office utilizes the latest technologies for determining and maintaining roadway centerlines and boundaries; retracing and setting new monuments for original public land surveys; preparing geographic information system mapping for real estate tax assessments; and establishing precise countywide horizontal and vertical control to maintain uniformity in construction, surveying, and mapping.
Franklin County Engineer
Franklin County Engineer
Rain may have been in the forecast, but it did not stop the successful 2nd Annual Spring Training Days at FCEO. Thank you to our outstanding presenters from FCEO, fellow government agencies, and community partners who shared their time, knowledge, and expertise with our team. Investing in learning, collaboration, and professional growth helps keep us strong as an organization and better prepared to serve the public.
Franklin County Engineer
Franklin County Engineer
Notice to Contractors: We are accepting bids on the Franklin County Engineer’s Office 2026 General Bridge Maintenance Contract. Visit: https://www.bidexpress.com/solicitations for more information.
Franklin County Engineer
Franklin County Engineer
Rohr Road, between Bixby Road and Creekside Parkway, will be closed beginning Monday, May 4, 2026, for road widening work. The closure will last approximately sixty (60) days, weather permitting.
Franklin County Engineer
Franklin County Engineer
April is National Records and Information Management Month, a time to recognize the work that helps public agencies stay organized, transparent, and efficient. At the Franklin County Engineer’s Office, accurate records and reliable information support infrastructure planning, project coordination, maps, permits, and public service. Thank you to those who help keep our agency informed, accountable, and operating effectively. #RIMMonth
Franklin County Engineer
Franklin County Engineer
Great energy, nice weather, and great community spirit! #TeamFCEO was proud to join Celebrate Trails Day at Scioto Audubon Metro Park. The annual event featured live music, local vendors, food trucks, activities, and fun for all ages while celebrating the value of trails in our community. #CelebrateTrails
Franklin County Engineer
Franklin County Engineer
Yesterday, #TeamFCEO welcomed the next generation to our office for Bring Your Child to Work Day! From big equipment to hands-on activities and behind-the-scenes fun, it was a day full of learning, laughter, and smiles. Thank you to everyone who helped make it a great day!
Franklin County Engineer's Office
970 DUBLIN ROAD
COLUMBUS, OHIO 43215
(614) 525-3030
fracoeng@franklincountyengineer.org

Follow Us

Top
 

Bridge Builders Biography Chapter 16

Bridge Builders Biography Chapter 16

Portman Park Pedestrian Bridge

bridge
bridge

The Portman Park Pedestrian Bridge, spanning Blacklick Creek, was installed for the City of Columbus Parks and Recreation Department by the Franklin County Engineer Bridge and Utility Maintenance Department on May 24, 2012.

The 102-foot long, single-span, steel truss structure was designed and prefabricated by Contech Bridge Solutions for $75,000.

The previous steel girder bridge, built in 1948, carried Long Road over the creek until 2002 when structural deterioration caused the roadway to be vacated and the bridge to be limited to pedestrian use. The crossing was then demolished in 2010.

The installation of the prefabricated structure on stone abutments from the old bridge was an efficient and cost effective way to meet pedestrian needs as well as minimize environmental impacts to the park and waterway.